List of All Contracts Awarded

Print Friendly

There is Contract Award Notice for Package Technical Assistance for Development of Slope Stabilization, Design and Management Western Indonesia Road WINRIP IBRD Loan No.8043-ID. Here is the announcement link on the website of the Ministry of Public Works. Download

And the following is list of all contracts awarded of WINRIP project.

PACKAGE NO. PACKAGE CONTRACTOR CONTRACT NO. CONTRACT SIGNATURE DATE PROCUREMENT METHOD CONTRACT PRICE (IDR 1.000.000) INCLUDING TAX WORLD BANK FINANCING RATIO (%)
ORIGINAL ADDENDUM
1 Krui – Biha PT. Jaya Konstruksi Manggala Pratama, Tbk. 10-17/01-WINRIP-WP1/CE/A/8043-ID/11-13 11/25/2013 ICB 134,909.211 154,073.015 70
2 Padang Sawah – Sp.Empat (incl. Air Gadang Bridge) PT. Jaya Konstruksi Manggala Pratama, Tbk. 39-06/02-WINRIP-WP1/CE/A/8043-ID/12-13 12/06/2013 ICB 197,936.699 226,713.217 70
3 Manggopoh – Padang Sawah PT. Jaya Konstruksi Manggala Pratama, Tbk. 40-06/03-WINRIP-WP1/CE/A/8043-ID/12-13 12/06/2013 ICB 143,688.963 165,157.772 70
4 Ipuh – Bantal PT. Waskita Karya – PT. Daya Mulia Turangga, J.O. 01-26/04-WINRIP-WP1/CE/A/8043-ID/11-13 11/14/2013 ICB 186,936.75 196,438.084 70
5 Simpang Rampa – Poriaha PT. Nusa Konstruksi Enjiniring, TBK 01-03/05-WINRIP-WP2/CE/A/8043/03-15 05/04/2015 ICB 107,321.260 70
6 Ps. Pedati – Kerkap PT. Waskita Karya 04-26/06-WINRIP-WP2/CE/A/8043/02-15 03/03/2015 NCB 86,517.470 118,444.156 70
7 Indrapura – Tapan PT. Adhi Karya (Persero) Tbk. 01-06/07-WINRIP-AWP II/CE/A/8043/12-15 12/03/2015 NCB 129,699.9 70
8 Bts.Kota Pariaman – Manggopoh PT. PP (Persero), Tbk. – PT. Statika Mitra Sarana, J.O. 06-06/08-WINRIP-WP2/CE/A/8043-ID/01-16 01/28/2016 ICB 355,500 70
9 Rantau Tijang – Kota Agung NCB
10 Simpang Empat – Sp.Air Balam ICB
11 Bantal – Mukomuko PT. Hutama Karya (Persero) – PT. Daya Mulia Turangga 02-26/11-WINRIP-AWP2/CE/A/8043.ID/12-14 12/18/2014 ICB 228,899.717 262,611.303 70
12 Kambang – Indrapura PT. Lancarjaya Mandiri Abadi – PT. Cahaya Tunggal Abadi, J.O. 02-06/07-WINRIP-AWP II/CE/A/8043/01-16 01/28/2016 ICB 358,950.419 70
13 Sp Rukis – Tj Kemuning PT. Waskita Karya (Persero) Tbk 01-26/13-WINRIP-AWP2/CE/A/8043.ID/12-14 12/18/2014 ICB 292,700.00 70
14 Painan – Kambang KSO PT. Yasa Patria Perkasa – Conbloc 03-06/14-WINRIP-AWPIII/CE/A/8043/6-16 06/01/2016 NCB 214,327.429 70
15 Sibolga – Batas Tapsel PT. PP (Persero), Tbk. 02-03/15-WINRIP-WP2/CE/A/8043/07-15 07/13/2015 ICB 260,100 70
16 Seblat – Ipuh, (incl. Air Lalang & Air Guntung Bridge)  KSO PT. Yasa Patria Perkasa – PT. Multi Structure  05-26/16-WINRIP-WP3/CE/A/8043-ID/10-16  28/10/2016 NCB 211,374 70
17 Sp.Gng Kemala – Pugung Tampak PT. Jaya Kostruksi Manggala Pratama, Tbk 07-17/17-WINRIP-AWP2/CE/A/8043.ID/11-14 11/17/2014 ICB 199,551.23 70
18 Mukomuko – Batas Sumbar NCB
19 Lais – Bintunan PT. Rodateknindo Purajaya 05-26/19-WINRIP-WP2/CE/A/8043/02-15 03/03/2015 NCB 33,689.452 44,419.76 70
20 Lubuk Alung – Sicincin PT. Nindya Karya (Persero) 14-06/20-WINRIP-AWPIII/CE/A/8043/06-16 06/01/2016 NCB 113,818.304 70
21 Lubuk Alung – Kuraitaji PT. Multi Structure 15-06/21-WINRIP-AWPIII/CE/A/8043/06-16 06/01/2016 NCB 126,301.991 70

 


    APLIKASI
    • File Storage
    • Peta Proyek
    • Admin DMS
    • Admin CHS
    • Admin FMIS
Copyright © 2013 WINRIP - Kementerian Pekerjaan Umum dan Perumahan Rakyat, Direktorat Jenderal Bina Marga, Direktorat Pengembangan Jaringan Jalan